Page 4 of 6 FirstFirst ... 23456 LastLast
Results 46 to 60 of 84

Thread: LRT - Are You in Favour ?

  1. #46
    Join Date
    Dec 2005
    Location
    in a house on a hillside
    Posts
    5,428
    according to this article in Star Metro today, Prasarana has applied for planning permission for 7 stations in MPSJ area (not sure of the details of which ones) of which 2 (in Kinrara) have been approved.

    Dunno if those are for the Ampang LRT extension (which I think has 11 of 12 stations in MPSJ territory) or the Kelana Jaya extension (which has 9 stations in MPSJ territory).

    Cheers, m
    The world needs more Canada

  2. #47
    Join Date
    Nov 2007
    Location
    Outside
    Posts
    714
    Keep the pressure on LRT right up there.

  3. #48
    Join Date
    Dec 2000
    Location
    https://twitter.com/#!/hurricanemax
    Posts
    6,486
    Quote Originally Posted by AllUrban
    according to this article in Star Metro today, Prasarana has applied for planning permission for 7 stations in MPSJ area (not sure of the details of which ones) of which 2 (in Kinrara) have been approved.

    Dunno if those are for the Ampang LRT extension (which I think has 11 of 12 stations in MPSJ territory) or the Kelana Jaya extension (which has 9 stations in MPSJ territory).

    Cheers, m

    any idea on where specifically the stops will be in SJaya? I mean other than the obvious ktm station and maybe also ss15? ss18????

    thanks.
    in luv with bikes...in lust with AphroditeS AWAS! Suspek is an Avid procurer to myths, lies, legends, folklores, i-ching, rumors, misinformation, cakap-ayam, spɹoʍ uʍop ǝpısdn puɐ˙˙DLL .
    p/s Take all the above with a XL salted duck egg, wash down with 2fingers of sodium hypochoride, and suck on to a pebble size tmn negara Rock salt

  4. #49
    Join Date
    Dec 2005
    Location
    in a house on a hillside
    Posts
    5,428
    Quote Originally Posted by tupai
    any idea on where specifically the stops will be in SJaya? I mean other than the obvious ktm station and maybe also ss15? ss18????

    thanks.
    3 stations in Subang Jaya

    SS16 above the KTM Station
    SS15 opposite Pelita
    SS18 opposite the commercial area and park

    Cheers, m
    The world needs more Canada

  5. #50
    Join Date
    Dec 2000
    Location
    https://twitter.com/#!/hurricanemax
    Posts
    6,486
    Quote Originally Posted by AllUrban
    3 stations in Subang Jaya

    SS16 above the KTM Station
    SS15 opposite Pelita
    SS18 opposite the commercial area and park

    Cheers, m

    Thanks M for the info...but opposite pelita is a park! Or they are building a flyover stop of sort? Asnd ss18 area oppo the commercial is also a park...
    Looks like we gonna be losing our green area then...they sure wanna make car parks there!

    aiyaya!
    in luv with bikes...in lust with AphroditeS AWAS! Suspek is an Avid procurer to myths, lies, legends, folklores, i-ching, rumors, misinformation, cakap-ayam, spɹoʍ uʍop ǝpısdn puɐ˙˙DLL .
    p/s Take all the above with a XL salted duck egg, wash down with 2fingers of sodium hypochoride, and suck on to a pebble size tmn negara Rock salt

  6. #51
    Join Date
    Jan 2005
    Location
    Subang Jaya
    Posts
    246
    The authorities did not approve LRT to pass through the zoo because it disturb the animals. But it is ok for the LRT to pass through between 2 buildings (Empire Gallery and O-Saujana).. It is ok to pass through the park in SS15 and SS18. Seems human are more resilient

  7. #52
    Join Date
    Oct 2009
    Location
    SS18/2A
    Posts
    123
    http://www.themalaysianinsider.com/m...heir-backyard/

    like them PJ-ian folks, we SJ-ians should insist the same.. i.e. LRT to go underground!!!

  8. #53
    Join Date
    Dec 2004
    Location
    SS18 SUBANG JAYA
    Posts
    547
    What to do...pasarana don't want to spend too much..spend less and then harvest more..thats the policy.

  9. #54
    Join Date
    Nov 2007
    Location
    Outside
    Posts
    714
    IS LRT still on? I thought it is dead? just NATO only..target date is 2012 to finish?

    we are already 2011 FEB...lah...cheap talk..only..

  10. #55
    Join Date
    May 2004
    Location
    Kota Kemuning
    Posts
    3,740
    Quote Originally Posted by Mat Bruce
    IS LRT still on? I thought it is dead? just NATO only..target date is 2012 to finish?

    we are already 2011 FEB...lah...cheap talk..only..
    I am assuming that piling will start one week before GE. Until then, sleep tight.

  11. #56
    Join Date
    Apr 2011
    Location
    USj 15
    Posts
    87
    I go out at 6.20am daily to catch the LRT from KJ to KLCC. Less traffic early morning but coming back is a pain esp the Kesas interchange/summit traffic light stretch. So yes, pls bring the LRT to SJ/USJ. BTW, you can buy the 30 days pass for RM 100, unlimited rides. So no problem with the ticket price.

  12. #57
    Join Date
    Nov 2006
    Location
    none
    Posts
    5
    Wonder what is going on with the LRT extension now..
    Is there already a suggested plan open for public to review?

  13. #58
    Join Date
    Sep 1999
    Location
    USJ
    Posts
    4,980
    Quote Originally Posted by Superman7
    Wonder what is going on with the LRT extension now..
    Is there already a suggested plan open for public to review?
    I understand the 1st package was already given up. 1st package is for the line up to Summit area. The 2nd package is supposed to have been awarded anytime now. I heard work on Package 1 had already started.

  14. #59
    Join Date
    Dec 2004
    Location
    SS18 SUBANG JAYA
    Posts
    547
    I think they are doing some soil testing..

  15. #60
    Join Date
    Oct 2005
    Location
    USJ6
    Posts
    824
    There is one big hole dug at USJ 6/6N ... with cement cylinders left along USJ 6/7 ........ are these works for soil testing for Station 8 also?

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •